CSI Ingenieros was hired by consortium Teyma-Saceem, responsible of the project, the supply and installation of 8 motor generators Wärtsilä 12V46 of 10MVA, in order to carry out the detailed engineering of the whole piping of the engine room and its interconnection to the services of Batlle power station.