Detailed Engineering for 150 kV Busbars renewal in UTE Baygorria Power Station, in Durazno, Uruguay

Client: Adminsitración Nacional de Usinas y Trasmisiones Eléctricas (UTE)
Industry & Construction
Mechanical, Electrical and Plumbing Engineering (MEP)
URUGUAY

UTE hires CSI Ingenieros to elaborate the detailed engineering for the adequacy of the 1 and 2 existent bus bars and of the new taps to the new bus bar section isolators of the Baygorria Station located in Durazno Department, Uruguay.
UTE is nowadays readapting part of the Baygorria Station (hydraulic generation of 3 x 36 MW) which implies changing the conductive material that conforms the 1 and 2 bus bars of the station, refurbishing the bus bars section isolators, changing the cables (taps) that connect the bus bars to the bus bars section isolators to be refurbished.