CSI Ingenieros was hired to supervise the design and construction of a new multipurpose berth, named Dock C (Muelle C, in Spanish). In addition, CSI was also in charge of the construction of an esplanade of 3.5 hectares, together with installations and other related works needed for the appropriate operation of Dock C.
The new Dock C is 330 m long and has capacity to operate overseas vessels at a maximum level of -14.00 m PRH (ex Wharton).