We were contracted to design and implement a new floor level system at a plant to replace an elevated water tank. The goal was for the new system to supply fresh water to the plant’s process more efficiently. We also upgraded the clarification system, removing some of the old infrastructure and installing a mechanically and electrically upgraded version.
The project focused on several disciplines: mechanical, electrical and structural.
The modernization of the water system improved the plant’s operational efficiency and safety. This allowed for more reliable water distribution for the production process.
