In line with our commitment to the energy transition, we were responsible for the detailed design of a new 100 MW wind farm located in the Flores region of Uruguay.
This project represented a key step in strengthening renewable energy in Uruguay and showcased our ability to comprehensively manage works of great technical and territorial complexity.
Scope of the project
Our work covered the detailed design of both the wind farm itself and the connection facilities required to integrate it into the national power grid.
In particular, our team was in charge of:
Wind farm
Connection works
We also managed the permitting and licensing processes with UTE, ensuring regulatory compliance and the operational feasibility of the project.