We worked on the detailed design of the domestic wastewater pumping station for the Manga basin. The work included the planning of the Manga and Repetto force mains, as well as the modernization of the Repetto pumping station. We integrated the hydraulic, structural, electrical, mechanical, and architectural components to deliver a complete and functional design.
Our work focused on several key areas:
The outcome of our work included design drawings, design reports and calculations, technical specifications, and bill of materials. This allowed the client to launch a bidding process for the construction phase.
This project enabled us to design an integrated solution for wastewater pumping, ensuring the proper operation of the system and the optimization of resources.