We conducted the preliminary engineering design for a new electrical substation and its associated switchyard, intended to supply a data center complex in Clarksville, Arkansas, United States. The project aimed to establish the technical foundations necessary for a reliable, scalable electrical infrastructure capable of keeping pace with the complex’s growing energy demand.
Our involvement included the development of conceptual engineering and the technical documentation necessary to support the future execution of the project under an EPCM model, incorporating design, constructability, and planning criteria from the initial stages.
We develop:
Through this project, we are contributing to the development of the electrical infrastructure that will power a complex of data centers with high energy demands. Our engineering team provided the technical foundation for a reliable and scalable solution, facilitating the planning of the next stages of design and construction and supporting the growth of critical digital infrastructure.