In consortium with SUL, we were contracted by the construction company TSE for the detailed design of the rehabilitation of the water treatment plants in the cities of Kuito and Huambo, in Angola. The works, which were subsequently executed by TSE, were aimed at improving the water treatment infrastructure for the National Water Authority (DNA).
For the Kuito plant, with a capacity of 330 m³/h, our work focused on the hydraulic design of various components:
In the case of Huambo, which has two plants in parallel with a total capacity of 1,360 m³/h, our work included:
The project was developed in three stages: diagnosis, preliminary project and detailed design, which we completed in six months.
This project allowed us to bring our engineering expertise to improve the water infrastructure in Angola, contributing to the health and well-being of the populations of Kuito and Huambo.