Our work was to supervise the executive project of a Wastewater Treatment Plant (WWTP). The plant was designed for an average flow of 330 l/s, with three treatment lines of 110 l/s each. In this first stage, we built the plant to treat 220 l/s. A 6.78 km treated water outfall was also constructed.
The project had several objectives:
The quality of the treated water complied with NOM-003-ECOL-1997. The treated sludge complied with NOM-004-SEMARNAT-2002 for class “B” sludge.
Our supervision ensured the correct construction and operation of a treatment plant. This allowed for efficient sanitation that meets environmental standards.