CSI was hired by the Consorcio Constructor del Ferrocarril Central (CCFC) to develop the executive design for all vehicle crossings included in the remodeling project of Uruguay’s central railway line, which spans approximately 300 km.
Scope of the project
260 level crossings were designed, including: road design, drainage design, and horizontal and vertical signage. Additionally, the necessary road detours were developed to mitigate the project’s impact on traffic during the different construction phases.
Methodological Approach
All design packages for the various specialties were developed using BIM (Building Information Modeling) methodology, which allowed for efficient integration between disciplines and improved construction planning and monitoring.
Applied Technical Standards
The project was carried out in strict compliance with current national technical specifications and standards, including:
Key manuals and instructions were also considered, such as: