We were contracted to supervise the design and construction of the new Pier C, a 330-meter-long multipurpose berth designed to accommodate oceangoing vessels. The project also included a 3.5-hectare esplanade, along with complementary facilities and related works essential for safe and efficient operation.
Our Scope:
Impact:
With this project, we contributed to strengthening the country’s port infrastructure, ensuring a high-quality execution with demanding technical and environmental standards and a rigorous control approach at every stage.
