We were contracted to support the Engineering Department of UGD-OSE in the modeling of the main potable water distribution network of Maldonado and Punta del Este. Our objective was to deliver a calibrated model that would allow them to make operational decisions and accurately predict pressures within the network. The project was carried out in two phases: the development of the hydraulic model and its subsequent calibration.
Our work focused on the following tasks:
1. Development of the Hydraulic Model
2. Model Calibration
At the end, we delivered a calibrated and fully functional general model in EPANET, along with pressure maps at different times of the day and a detailed report of the work and results obtained.
This project allowed us to provide UGD-OSE with a management and planning tool for the water network of Maldonado and Punta del Este, facilitating decision-making for its operation.